SAJ

    The SAJ B2 SERIES offers advanced energy storage solutions tailored to a diverse array of applications.

    The SAJ B2 SERIES offers advanced energy storage solutions tailored to a diverse array of applications. Utilizing LiFePO4 batteries that provide reliability and safety, these wall-mounted or ground-mounted units provide optimum depth of discharge with a remarkable 90% efficiency. The modular and scalable design, ranging from 5.0 kWh to 25.0 kWh, along with IP65 outdoor design, ensures the B2 SERIES can be custom-fitted to various needs, offering robustness and adaptability in various conditions.

    Features Of Product

    • Technology

      LiFePO4 Batteries: Offers reliability with a safe 90% Depth of Discharge. Remote Firmware Upgrade: Allows easy updating and maintenance.

    • Modular

      Modular and Scalable Design: Easily expandable up to 25.0 kWh to fit specific energy requirements.Mounting Flexibility: Can be both wall-mounted or ground-mounted, offering installation versatility.

    • Compliance

      Compliance with International Standards: Including IEC 62619, EN 62477-1, EN 61000-6-1/2/3/4, UN38.3.

    • Installation

      IP65 Outdoor Design: Ensures protection and functionality in various weather conditions. Remote Firmware Upgrade: Allows easy updating and maintenance via eSolar portal.

    Want to Explore More of Our Products?

    We offer a wide range of innovative solar solutions designed to meet both residential and industrial needs. If you're interested in reliable, high-performance solar technology, check out our product categories below.

    The number of eligible certificates may differ based on when the system is installed, so all figures should be treated as estimates. While batteries can be physically installed before July 1st, 2025, they will only qualify once they are activated on or after that date, as confirmed by the CCEW.

    • Battery Installation: Allowed before July 1st, 2025.
    • Eligibility Start: Begins only when batteries are activated on or after July 1st, 2025.
    • Proof of Activation: The CCEW must show a switch-on date of July 1st, 2025 or later.
    • Further Requirements: A checklist outlining additional required documentation for claims will be provided soon.

    Solar Rebate Calculator